This is Coca-Cola’s first purpose designed factory, for
production, bottling and storage, in Kuwait. The project includes the bottling plant, offices, laboratory, workshops and dormitories for the employees.
At the beginning of the project Gulf Consult carried out an extensive site study; part of the site was reclaimed and required filling and stabilisation before work could commence.
Project Details
Location: Sabhan Industrial Estate, Kuwait.
Client: Refreshment Trading Company.
Services Performed:
Architectural / Engineering
Design and Construction
Supervision.
Cost:
KD 3 million.
Completion:
1995.
Project Data:
26,315 sq.m Floor area. 64 Car parking spaces
Click here for a bigger picture of the project. (Only viewable in a resolution of 1024 x 768).