Gulf Consult was appointed by M.A. Kharafi Construction to
provide design & supervision for this turn-key for MPW.

Gulf Consult engaged MWH to assist as a sub- consultant for the specialist design and construction management of the sanitary components: sewers, pumps and related facilities.

The project involves the replacement of a series of 30 sewage pump stations in the area bounded by 4th Ring Road and the Gulf by a single 40m deep pump station at Riggae.

The new pump station will handle 778,000 cu.m per day, with facilities for grit removal, odour control, instrumentation and telemetry.



Project Details



Location: Riggae.

Client: M.A. Al Kharafi & Sons (on behalf of M.P.W).

Services Performed:
Full Architectural and Engineering Design.

Cost: Confidential.

Completion: Design complete Construction completion due in 2006.

Project Data:
Administration Building, Pumpstation and Substation/services.

In conjunction with the new pump station, a new interceptor sewer of diameter up to 2250mm is to be constructed to collect sewage from the redundant pump stations.

The interceptor will be constructed using micro-tunneling at depths of up to 35m with 40km of such tunnels.

Vortex-type manholes will be installed at pipe junctions at different levels.